PHASE 2 PROJECT PHOTOS – CONSTRUCTION PHOTOS

Installed safety nets at Elev. 4-Stair -2 2nd Floor Facing South-West (800x600).jpg Installing rebar along foundation walls at column line 6.5 (G-C.7) Facing South-West (800x600).jpg Installing rebar at Footing....... Facing South-West (800x600).jpg Metal Decking at Derrick -2 3rd Floor Facing South (800x600).jpg Safety Post at Derrick -1 2nd Floor Facing West(800x600).jpg Installed safety nets at Elev. 1,2,3 2nd Floor Facing South (800x600).jpg Installing steel safety post at Derrick -1 2nd Floor Facing West (800x600).jpg Metal Decking at Derrick -1, -2 2nd Floor Facing East (800x600).jpg Metal Decking at Derrick -2 3rd Facing East (800x600).jpg
Previous pageNext page Safety Post at Derrick -1 2nd Floor Facing West(800x600)
Safety Post at Derrick -1 2nd Floor Facing West(800x600)